Paver bedding: 10 ft × 10 ft, 1 in deep
A thin leveling layer. One inch is 0.0833 ft, so the volume is 100 ft² × 0.0833 ft.
100 ft² × 0.0833 ft = 8.33 ft³ ÷ 27 = 0.31 yd³
At 1.4 tons per cubic yard that is about 0.43 tons.
Free sand calculator: find out how much sand you need in cubic yards and tons for a paver base, sandbox, aboveground pool base or leveling job.
Enter your dimensions, then press Calculate.
Area = length × width · Volume = area × depth
Sand jobs vary from a paper thin bedding layer to a deep play area, and the depth drives almost everything. A 100 square foot patio with a one inch bedding layer needs about 0.3 of a cubic yard. Fill that same area six inches deep and it is 1.85. The table shows how area and depth combine.
| Area | 1 in deep | 2 in deep | 6 in deep |
|---|---|---|---|
| 25 sq ft | 0.08 yd³ | 0.15 yd³ | 0.46 yd³ |
| 100 sq ft | 0.31 yd³ | 0.62 yd³ | 1.85 yd³ |
| 200 sq ft | 0.62 yd³ | 1.23 yd³ | 3.7 yd³ |
| 500 sq ft | 1.54 yd³ | 3.09 yd³ | 9.26 yd³ |
Your own area will not match those round numbers, so use the sand calculator above for the real thing. For a plain English walkthrough of the volume math, see the cubic yard calculation guide, and for bedding layers, sandboxes and pool bases, our guide to how much sand you need.
Enter the area and the depth of the layer, and it returns cubic yards and tons, the two units sand suppliers quote.
Try another depth and press Calculate again to compare before you place an order. Volume and weight come from the same measurements, so the figures always agree when you ask for a quote.
If you would rather calculate sand cubic yards on paper, there are three short lines.
Cubic feet = area (ft²) × depth (ft)
Cubic yards = cubic feet ÷ 27
Tons = cubic yards × density (tons per yd³)
Depth must be in feet, so 1 inch is 1 ÷ 12 = 0.0833 ft. Sand is sold by the cubic yard or by the ton, and a yard of damp sand weighs more than a yard of dry sand, so treat the tonnage as an estimate. If you only need the volume, the cubic yard calculator runs the same sum without the weight step.
Sand jobs are usually simple shapes: a patio, a sandbox or a pool base. Find the drawing that matches, measure the lettered sizes and enter them in the sand calculator to get cubic yards and tons. A hexagonal sandbox is worked out in our sand guide.
Paver patios, walkways and play areas.
Area = L × W
Volume (ft³) = Area × D ÷ 12
Cubic yards = Volume ÷ 27
L = length (ft) · W = width (ft) · D = depth (in)
Example: L = 16 ft, W = 14 ft, D = 1 in. Area = 224 ft². Volume = 224 × 1 ÷ 12 = 18.67 ft³, which is 0.69 yd³.
Square sandboxes.
Area = S × S
Volume (ft³) = Area × D ÷ 12
Cubic yards = Volume ÷ 27
S = side length (ft) · D = depth (in)
Example: S = 6 ft, D = 10 in. Area = 36 ft². Volume = 36 × 10 ÷ 12 = 30 ft³, which is 1.11 yd³.
The sand base under a round pool that sits above ground.
Area = π × (Ø ÷ 2)²
Volume (ft³) = Area × D ÷ 12
Cubic yards = Volume ÷ 27
Ø = diameter (ft) · D = depth (in)
Example: Ø = 20 ft, D = 2 in. Area = 314.16 ft². Volume = 314.16 × 2 ÷ 12 = 52.36 ft³, which is 1.94 yd³.
Bedding sand for a paver border around a patio.
Area = (L + 2b) × (W + 2b) − L × W
Volume (ft³) = Area × D ÷ 12
Cubic yards = Volume ÷ 27
L = inner length (ft) · W = inner width (ft) · b = border width (ft) · D = depth (in)
Example: L = 20 ft, W = 15 ft, b = 1 ft, D = 1 in. Area = 74 ft². Volume = 74 × 1 ÷ 12 = 6.17 ft³, which is 0.23 yd³.
There is no single right depth. These are common starting points; your project, product and local rules decide the real figure.
Pavers usually sit on a compacted gravel base with a thin leveling layer of coarse sand on top, often around one inch. Calculate the sand here and the base with the Gravel Calculator.
Depth depends on how the sand will be used. Many sandboxes are filled to several inches, and a deeper box suits digging. Measure the frame, enter the height of the sand, and the calculator does the rest.
A light layer of sand is sometimes spread to even out a low patch or work into a lawn. These layers are thin, often well under an inch, so the volume is small. Enter the real depth and the result will show it.
Sand around buried pipes or cables is usually specified by the utility or the manufacturer. Use the depth in their instructions and measure the trench as a long, narrow rectangle.
Coverage is volume divided by depth, so a thin layer goes a very long way. Here is what one cubic yard covers, and what a ton covers at 1.4 tons per cubic yard.
| Depth | 1 cubic yard covers | 1 ton covers (at 1.4 t/yd³) |
|---|---|---|
| 1 in | 324 sq ft | about 231 sq ft |
| 2 in | 162 sq ft | about 116 sq ft |
| 3 in | 108 sq ft | about 77 sq ft |
| 4 in | 81 sq ft | about 58 sq ft |
| 6 in | 54 sq ft | about 39 sq ft |
| 12 in | 27 sq ft | about 19 sq ft |
Suppliers quote by the yard, by the ton, or both, so a conversion is handy. The calculator does it for you, and the table shows how much the density matters.
| Cubic yards | 1.3 t/yd³ (dry) | 1.4 t/yd³ (default) | 1.5 t/yd³ (damp) |
|---|---|---|---|
| 0.5 | 0.65 tons | 0.7 tons | 0.75 tons |
| 1 | 1.3 tons | 1.4 tons | 1.5 tons |
| 2 | 2.6 tons | 2.8 tons | 3 tons |
| 5 | 6.5 tons | 7 tons | 7.5 tons |
| 10 | 13 tons | 14 tons | 15 tons |
Wet sand can be heavier still. If a load arrives soaked, the weight on the ticket will be higher than you expected for the same volume, which is why asking the supplier for their density is worth the extra minute.
A thin leveling layer. One inch is 0.0833 ft, so the volume is 100 ft² × 0.0833 ft.
100 ft² × 0.0833 ft = 8.33 ft³ ÷ 27 = 0.31 yd³
At 1.4 tons per cubic yard that is about 0.43 tons.
A small box filled to eight inches: 16 ft² × 0.6667 ft.
16 ft² × 0.6667 ft = 10.67 ft³ ÷ 27 = 0.4 yd³
At 1.4 tons per cubic yard that is about 0.55 tons.
Many aboveground pool kits ask for a level sand layer under the liner. Take the depth and the pad size from your pool's instructions; this example uses 2 inches over an 18 ft circle.
254.469 ft² × 0.1667 ft = 42.41 ft³ ÷ 27 = 1.57 yd³
At 1.4 tons per cubic yard that is about 2.2 tons.
A rectangle of 300 ft², spread two inches deep (0.1667 ft).
300 ft² × 0.1667 ft = 50 ft³ ÷ 27 = 1.85 yd³
At 1.4 tons per cubic yard that is about 2.59 tons.
Metric inputs are converted exactly (1 ft = 0.3048 m). The result is shown in cubic yards and tons.
64.5835 ft² × 0.164 ft = 10.59 ft³ ÷ 27 = 0.39 yd³
With 10% allowance: 0.43 cubic yards. At 1.4 tons per cubic yard that is about 0.6 tons.
A little extra is common. Sand compacts, some is lost to spillage, and the surface under it is rarely perfectly flat. Enter your own percentage in the optional waste field. It starts at 0%, so the calculator never adds extra on its own, and weight and cost are based on the total including your allowance.
It depends on the type of sand and how wet it is. Dry sand is often around 1.3 to 1.5 tons per cubic yard, damp sand about 1.5 to 1.7, and wet sand heavier still. This sand calculator starts at 1.4 and lets you edit it.
The leveling bed under pavers is usually a thin layer, often around one inch, on top of a compacted base. Follow the paver manufacturer's instructions and local guidance, and calculate the base separately.
Multiply the box's length, width and sand depth, all in feet, then divide by 27 for cubic yards. Multiply by the density to get tons. A 4 ft by 4 ft box filled 8 inches deep needs about 0.4 cubic yards.
Choose Circle, enter the pool's diameter (or the pad size if the instructions ask for sand past the wall) and the depth the kit calls for. An 18 ft round pool with 2 inches of sand needs about 1.57 cubic yards. Always follow your pool's own instructions for the depth.
No. Pool filter sand is sold by weight, and the amount depends on the filter, so use the figure on your filter's label or in its manual. This calculator suits the sand base under an aboveground pool.
Yes, this one. It shows cubic yards, the weight in US tons and metric tonnes. Change the density if your supplier quotes a different figure.
It depends on the job. Coarse concrete sand is the usual choice for the bed under pavers, washed play sand suits sandboxes, and finer masonry sand is made for mortar. The volume is the same whichever you buy, but ask your supplier for the density, because it changes the weight.
Yes. Choose Known Area and type the square footage (or m², yd² and so on), then enter the depth.
APA style
Khan, M. A. (2026, October 19). Sand Calculator. CY Calculator. https://cycalculator.com/sand-calculator